Company Information

Optimal Home Inspections

Phone: 732-325-8642
marshdak@gmail.com
https://optimalhomeinspections.com/

Inspected by: Marshal
NJ State Home Inspector #: #24GI00097XXX

Overall, this house is above average for age and type. The house appears well-maintained and cared for with a new kitchen install. The original build looks to have been quality and seems to be performing well to date. You will be coming up on the 20 year mark in about 5 years. This means the roof, furnace and decking are getting older and will require updating at some stage in the future. Please read this report for a list of typical maintenance and repair items.

The Scope and Purpose of a Home Inspection

Purchasing property involves risk

The purpose of a home inspection is to help reduce the risk associated with the purchase of a structure by providing a professional opinion about the overall condition of the structure. A home inspection is a limited visual inspection and it cannot eliminate this risk. Some homes present more risks than others. We cannot control this, but we try to help educate you about what we don’t know during the inspection process. This is more difficult to convey in a report and one of many reasons why we recommend that you attend the inspection.

A home inspection is not an insurance policy

This report does not substitute for or serve as a warranty or guarantee of any kind. Home warranties can be purchased separately from insuring firms that provide this service.

A home inspection is visual and not destructive

The descriptions and observations in this report are based on a visual inspection of the structure. We inspect the aspects of the structure that can be viewed without dismantling, damaging or disfiguring the structure and without moving furniture and interior furnishings. Areas that are concealed, hidden or inaccessible to view are not covered by this inspection. Some systems cannot be tested during this inspection as testing risks damaging the building. For example, overflow drains on bathtubs are generally not tested because if they were found to be leaking they could damage the finishes below. Our procedures involve non-invasive investigation and non-destructive testing which will limit the scope of the inspection.

This is not an inspection for code compliance

This inspection and report are not intended for city / local code compliance. During the construction process structures are inspected for code compliance by municipal inspectors. Framing is open at this time and conditions can be fully viewed. Framing is not open during inspections of finished homes, and this limits the inspection. All houses fall out of code compliance shortly after they are built, as the codes continually change. National codes are augmented at least every three years for all of the varying disciplines. Municipalities can choose to adopt and phase in sections of the codes on their own timetables. There are generally no requirements to bring older homes into compliance unless substantial renovation is being done.

This is just our opinion

Construction techniques and standards vary. There is no one way to build a house or install a system in a house. The observations in this report are the opinions of the home inspector. Other inspectors and contractors are likely to have some differing opinions. You are welcome to seek opinions from other professionals.

The scope of this inspection

This inspection will include the following systems: exterior, roof, structure, drainage, foundation, attic, interior, plumbing, electrical and heating. The evaluation will be based on limited observations that are primarily visual and non-invasive. This inspection and report are not intended to be technically exhaustive.

Your expectations

The overall goal of a home inspection is to help ensure that your expectations are appropriate with the house you are proposing to buy. To this end we assist with discovery by showing and documenting observations during the home inspection. This should not be mistaken for a technically exhaustive inspection designed to uncover every defect with a building. Such inspections are available but they are generally cost-prohibitive to most homebuyers.

Your participation is requested

Your presence is requested during this inspection. A written report will not substitute for all the possible information that can be conveyed verbally by a shared visual observation of the conditions of the property.

How to Read This Report

Getting the Information to You

This report is designed to deliver important and technical information in a way that is easy for anyone to access and understand. If you are in a hurry, you can take a quick look at our "Summary Page” and quickly get critical information for important decision making. However, we strongly recommend that you take the time to read the full Report, which includes digital photographs, captions, diagrams, videos and hot links to additional information.

The best way to get the layers of information that are presented in this report is to read your report online. This will allow all you to expand your learning about your house. You will notice some words or series of words highlighted in blue and underlined – clicking on these will provide you with a link to additional information.

This report can also be printed on paper or to a PDF document.

Chapters and Sections

This report is divided into chapters that parcel the home into logical inspection components. Each chapter is broken into sections that relate to a specific system or component of the home. You can navigate between chapters with the click of a button on the left side margin.

Most sections will contain some descriptive information done in black font. Observation narrative, done in colored boxes, will be included if a system or component is found to be significantly deficient in some way or if we wish to provide helpful additional information about the system or the scope of our inspection. If a system or component of the home was deemed to be in satisfactory or serviceable condition, there may be no narrative observation comments in that section.

Observation Labels

All narrative observations are colored, numbered and labeled to help you find, refer to, and understand the severity of the observation. Observation colors and labels used in this report are:

  • Major Concern:
    Repair items that may cost significant money to correct now or in the near future, or items that require immediate attention to prevent additional damage or eliminate safety hazards.
  • Repair:
    Repair and maintenance items noted during inspection. Please note that some repair items can be expensive to correct such as re-finishing hardwood floors, but are considered simply repair items due to their cosmetic nature.
  • Improve:
    Observations that are not necessarily defects, but which could be improved for safety, efficiency, or reliability reasons.
  • Monitor:
    Items that should be watched to see if correction may be needed in the future.
  • Due Diligence:
    Observation such as a buried oil tank that may require further investigation to determine the severity and / or urgency of repair.
  • Future Project:
    A repair that may be deferred for some time but should be on the radar for repair or replacement in the near future.
  • Efficiency:
    Denotes observations that are needed to make the home more energy efficient as well as to bring the home up to modern insulation standards. This category typically includes windows and insulation. Other items, such as lighting and appliances, are not inspected for their energy status.
  • Completed:
    Items that were initially an issue but have since been completed.
  • Note:
    Refers to aside information and /or any comments elaborating on descriptions of systems in the home or limitations to the home inspection.

Summary Page

The Summary Page is designed as a bulleted overview of all the observations noted during inspection. This helpful overview is not a substitution for reading the entire inspection report. The entire report must be read to get a complete understanding of this inspection report as the Summary Page does not include photographs or photo captions.

Summary

Major Concerns

  • (EG-2) Exterior/Garage:

    Overall, numerous repairs are needed to the decking systems on this house to ensure safe and reliable performance. I recommend additional inspection and repair of these decks by a qualified general contractor.

Repairs

  • (G-1) Grounds:

    The grade of the yard is sloping toward the building. When it rains water is directed to the foundation/basement. We recommend the yard be graded away from the building. 

  • (G-2) Grounds:

    The driveway is sloping toward the house and garage. This will allow water to drain toward the garage and could lead to water intrusion problems during heavy rains. We recommend a qualified contractor evaluate the driveway slope and repair as recommended.

  • (G-3) Grounds:

    The window well is full of vegetation and organic debris and needs to be cleaned to eliminate a conducive pest condition. Remove all soils and vegetation and repair any hidden rot to wood as needed.

    • On the left side of the house the window well cover is broken, this will allow water/snow to enter the window well which can lead to water to enter the basement. We recommend the cover be replaced.
  • (G-4) Grounds:

    All trees, branches and vegetation should be pruned at least six feet away from the building to eliminate a condition conducive to wood destroying organisms and a path for rodent entry.

  • (G-5) Grounds:

    The front stoop and stairs are missing a handrail for safety. We recommend a qualified contractor install suitable railings to reduce the potential for falls.

  • (G-6) Grounds:

    The front step has appeared to settle and is a tripping hazard. We recommend a qualified contractor evaluate the step and repair or replace.

  • (EG-1) Exterior/Garage:

    The water proofing for this deck appears to be at the end of its useful service life. The average life of these coatings is 5-10 years. Hire a deck water proofing specialist to further evaluate and replace.

    • Wood decay noted in some of the deck posts - rear left corner
    • The photos shows representative examples of wood decay in the decking system.
    • Tree is secured to railing, this not appropriate use of the post and could be pulled down with the tree.
    • Handrail has separated and is decaying, Replace.
    • The deck skirting obscures the structure of the deck and so it could not be observed. We recommend an invasive inspection to the deck structure by a professional deck contractor.
    • The tree is secured to the deck-post; this deck post is not designed to secure a tree; we recommend the support be removed.
    • Plantings are too close to the deck and contributes to wood damage; we recommend the trees be removed or regularly pruned.
  • (EG-3) Exterior/Garage:

    The decking on this deck has been painted and is very exposed to the weather. This will allow water to penetrate the wood and can hasten the deterioration process. Localized soft spots were found, but there appears to be some useful remaining service life. I recommend replacing this decking in the near term for safety and reliability. Please note that the structure of the deck is treated lumber and should be re-usable.

  • (EG-4) Exterior/Garage:

    The decks on this building have not been constructed to modern standards. This is common with older decks. Some of the items noted during inspection can be improved and repaired, while other items simply are the way they are until a more cohesive deck re-building is undertaken. It makes sense to improve and repair the deck where feasible to prolong the useful life of the deck and improve safety as is feasible. Hire a qualified general contractor to further investigate and repair / improve these decks as recommended.

  • (RA-1) Roof/Attic:

    The roofing material on this building is done in a three tab composition shingle. These are often rated as 20-25 year shingles. In practice, as a roof assembly, we find these last closer to 15-20 years depending on the quality of the installation, the steepness of the roof and the amount of exposure. The roof exhibited uniform granule loss typical of long-term weathering. This is a natural part of the aging process and can be expected to continue slowly. The installation appears old and near the end of its reliable service life.  We recommend a qualified roofing contractor evaluate the roof and estimate the cost of replacement.

  • (RA-2) Roof/Attic:

    The splash-block for the downspouts on the right side of the garage is buried in the ground and requires immediate replacement or resetting to insure proper control of roof runoff and prevent water damage to the home.

  • (RA-3) Roof/Attic:

    Repair all of the loose / poorly secured downspouts. Many of the downspouts are not well secured to the home and are vulnerable to disconnecting. This could lead to water damage. Tune up all downspouts to insure they are reliably secured.

  • (RA-4) Roof/Attic:

    Extender is directing water to the foundation; reposition extender to drain water away from the foundation.

  • (K-1) Kitchen:

    The loose faucet for the kitchen sink should be secured to prevent leaks.

  • (K-2) Kitchen:

    Stored items in the kitchen sink cabinet limited our observations.

Improves

  • (E-1) Electrical:

    AFCI (arc fault protection) is now recommended on all branch circuits supplying outlets or devices installed in residential dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, and similar rooms and areas. The goal of this protection is to reduce risks of electrical fires. Consult with a licensed electrician about improving circuit protection as desired.

Notes

  • (EG-5) Exterior/Garage:

    Please note that deck framing inspection was limited - I could not observe framing and deck structural components well because the closed wood skirting.

    • The deck skirting obscures the structure of the deck and so it could not be observed. We recommend an invasive inspection to the deck structure by a professional deck contractor.
    • The retractable awnings is out of scope and was not inspected.
  • (EG-6) Exterior/Garage:

    Extensive storage in the garage inhibited the view of most of the garage and limited visual inspection of this space.

  • (EG-7) Exterior/Garage:

    • This lock is not secured; if someone slides the catch closed and then operates the automatic door opener, serious damage can occur to the door, tracks, and/or the opener. We recommend securing the lock open with a small padlock or nut and bolt.
  • (P-1) Plumbing:

    Data Plate

  • (PB-1) Powder Bathroom:

    During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

  • (FB-1) Family Bathroom:

    During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

  • (MB-1) Master Bathroom:

    During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

General Comments

Building Characteristics / Conditions

Style of Home Traditional

Type of Building Single Family (2-story)

Approximate Square Footage 1560

Approximate Year of Original Construction 1997

Attending the Inspection Buyer/Client, Buyer and Buyer's Agent

Occupancy The home was occupied Occupied- occupants in the process of moving

Animals Present No

Approximate temperature during the inspection Below 65[F]

Weather during the inspection Clear

Ground/Soil surface conditions Wet

Grounds

Drainage and Lot Location

Clearance to Grade Standard

Downspout Discharge Above grade

Lot Description Flat

(G-1) Repair:

The grade of the yard is sloping toward the building. When it rains water is directed to the foundation/basement. We recommend the yard be graded away from the building. 

Driveways/Walkways/Flatwork

Driveway Asphalt

Walkways Concrete

Patios None noted

(G-2) Repair:

The driveway is sloping toward the house and garage. This will allow water to drain toward the garage and could lead to water intrusion problems during heavy rains. We recommend a qualified contractor evaluate the driveway slope and repair as recommended.

Window and Stairwells

(G-3) Repair:

The window well is full of vegetation and organic debris and needs to be cleaned to eliminate a conducive pest condition. Remove all soils and vegetation and repair any hidden rot to wood as needed.

  • On the left side of the house the window well cover is broken, this will allow water/snow to enter the window well which can lead to water to enter the basement. We recommend the cover be replaced.

Grounds, Trees and Vegetation

(G-4) Repair:

All trees, branches and vegetation should be pruned at least six feet away from the building to eliminate a condition conducive to wood destroying organisms and a path for rodent entry.

Exterior Stairs

Standard, concrete

(G-5) Repair:

The front stoop and stairs are missing a handrail for safety. We recommend a qualified contractor install suitable railings to reduce the potential for falls.

(G-6) Repair:

The front step has appeared to settle and is a tripping hazard. We recommend a qualified contractor evaluate the step and repair or replace.

Exterior/Garage

Siding and Trim

Trim Material Plastic

Siding Material Vinyl

Eaves

Vinyl

Exterior Doors

Solid core, Sliding glass

Exterior Window Frames

Vinyl

Decks and Balconies

Deck Structure Non-treated lumber

Deck Ledger Board Not visible

Guardrail Standard

Decking Material Hardwood

(EG-1) Repair:

The water proofing for this deck appears to be at the end of its useful service life. The average life of these coatings is 5-10 years. Hire a deck water proofing specialist to further evaluate and replace.

  • Wood decay noted in some of the deck posts - rear left corner
  • The photos shows representative examples of wood decay in the decking system.
  • Tree is secured to railing, this not appropriate use of the post and could be pulled down with the tree.
  • Handrail has separated and is decaying, Replace.
  • The deck skirting obscures the structure of the deck and so it could not be observed. We recommend an invasive inspection to the deck structure by a professional deck contractor.
  • The tree is secured to the deck-post; this deck post is not designed to secure a tree; we recommend the support be removed.
  • Plantings are too close to the deck and contributes to wood damage; we recommend the trees be removed or regularly pruned.
(EG-2) Major Concern:

Overall, numerous repairs are needed to the decking systems on this house to ensure safe and reliable performance. I recommend additional inspection and repair of these decks by a qualified general contractor.

(EG-3) Repair:

The decking on this deck has been painted and is very exposed to the weather. This will allow water to penetrate the wood and can hasten the deterioration process. Localized soft spots were found, but there appears to be some useful remaining service life. I recommend replacing this decking in the near term for safety and reliability. Please note that the structure of the deck is treated lumber and should be re-usable.

(EG-4) Repair:

The decks on this building have not been constructed to modern standards. This is common with older decks. Some of the items noted during inspection can be improved and repaired, while other items simply are the way they are until a more cohesive deck re-building is undertaken. It makes sense to improve and repair the deck where feasible to prolong the useful life of the deck and improve safety as is feasible. Hire a qualified general contractor to further investigate and repair / improve these decks as recommended.

(EG-5) Note:

Please note that deck framing inspection was limited - I could not observe framing and deck structural components well because the closed wood skirting.

  • The deck skirting obscures the structure of the deck and so it could not be observed. We recommend an invasive inspection to the deck structure by a professional deck contractor.
  • The retractable awnings is out of scope and was not inspected.

Garage

Attached

Automatic Garage Opener Present

Garage Door Type Metal

(EG-6) Note:

Extensive storage in the garage inhibited the view of most of the garage and limited visual inspection of this space.

(EG-7) Note:

  • This lock is not secured; if someone slides the catch closed and then operates the automatic door opener, serious damage can occur to the door, tracks, and/or the opener. We recommend securing the lock open with a small padlock or nut and bolt.

Roof/Attic

Roof Materials

Method of Roof Inspection Walked on roof

Roof Style Gable

Roof Materials Three-tab composition shingle

Approximate Age of Roof 20+

(RA-1) Repair:

The roofing material on this building is done in a three tab composition shingle. These are often rated as 20-25 year shingles. In practice, as a roof assembly, we find these last closer to 15-20 years depending on the quality of the installation, the steepness of the roof and the amount of exposure. The roof exhibited uniform granule loss typical of long-term weathering. This is a natural part of the aging process and can be expected to continue slowly. The installation appears old and near the end of its reliable service life.  We recommend a qualified roofing contractor evaluate the roof and estimate the cost of replacement.

Skylights

None noted

Gutters and Downspouts

Seamless Aluminum

(RA-2) Repair:

The splash-block for the downspouts on the right side of the garage is buried in the ground and requires immediate replacement or resetting to insure proper control of roof runoff and prevent water damage to the home.

(RA-3) Repair:

Repair all of the loose / poorly secured downspouts. Many of the downspouts are not well secured to the home and are vulnerable to disconnecting. This could lead to water damage. Tune up all downspouts to insure they are reliably secured.

(RA-4) Repair:

Extender is directing water to the foundation; reposition extender to drain water away from the foundation.

Attic Access

Crawled partial

Roof Framing and Sheathing

Rafters Truss

Sheathing Plywood

Attic Insulation

Insulation Type Fiberglass

Approximate Insulation R-Value on Attic Floor 30

Approximate Insulation R-Value on Attic Ceiling 0

Approximate Insulation R-Value on Attic Walls 0

Attic and Roof Cavity Ventilation

Attic Ventilation Method Ridge vents, Soffit vents

Electrical

Service Equipment

Volts 120/240

Service Drop Underground

Meter Base Amperage 200

Service Entrance (SE) conductor Size Aluminum, 2/0, 150 amps

Main Panel Amperage 150 amps

Electric Service Amperage 150 amps

Main Electric Panel Location Basement, Rear wall

(E-1) Improve:

AFCI (arc fault protection) is now recommended on all branch circuits supplying outlets or devices installed in residential dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, and similar rooms and areas. The goal of this protection is to reduce risks of electrical fires. Consult with a licensed electrician about improving circuit protection as desired.

Sub Panels

None noted

Branch Wiring

Wire Material Copper

Wiring Method Non-metallic sheathed cable

Receptacles and Fixtures

Inspection Method Random Testing

Electric Receptacles Three wire receptacles

Smoke and Carbon Monoxide Detection Systems

Present

Grounding Electrode / Conductor

Could Not Confirm

Plumbing

Water Service Supply

Pipe Material Copper

Well or Public Supply Public water

Main Water Shut-off Location Basement, right wall

Distribution Pipe

Supply Pipe Materials Copper, Not visible

Functional Flow Average

Waste Pipe and Discharge

Discharge Type Public sewer

Waste and Vent Pipe Materials PVC

Water Heater

System Type Tank

Manufacturer Rheem

Size 50 gal

Age 3

Energy Source Gas

Temperature Pressure Relief Value Present - Not Tested

(P-1) Note:

Data Plate

Exterior Hose Bibs

Operating

Additional Sinks

None noted

Sewage Ejector Pumps

None noted

Sump Pumps and Drains

Floor Drain None noted

Sump Pumps Present

French Drain Present

Dryer

Power Source Electric

Duct to Exterior Ducted

Radon Mitigation

Noted, No fan observed

(P-2) Note:

Passive Radon Mitigation System Installed; this is normal for this age house; radon test performed results will be mailed to you when the lab is finished (approximately 5 business days) See https://www.finehomebuilding.com/2014/05/14/radon-mitigation-systems

Heating, Cooling and Fireplaces

Heating System

Energy Source Natural gas

Heating Method Forced air furnace, Forced air furnace

Manufacturer Goodman, Goodman

Capacity 120,000 btu's, 120,000 btu's

Age ?

Last Service Record None

Filtration System Disposable, Disposable

Cooling Systems / Heat Pumps

None Noted

Heating / Cooling Distribution Systems

Heat Source in Each Room Present

Distribution Method Ductwork

Additional Heat Sources

None noted

Gas Fireplaces

None noted

Solid Fuel Fireplaces

None noted

Fuel Storage and Distribution

Oil Storage

None noted

Propane Storage

None noted

Gas Meter

Present, Left side of building

Gas Shutoff Location basement

Gas Pipe Materials Steel and flex pipe

Structure and Basement

Foundation

% of Foundation Not Visible 80%

Building Configuration Basement

Foundation Description Poured concrete

Floor, Wall and Ceiling Framing

Wall Framing Not visible

Wall Insulation Not visible

Wall Sheathing Not visible

Basement

Full

Basement Moisture

None noted

Interior

Floors

Floor Materials Carpet, Tile, Hardwood

Floor Settlement None noted

Walls, Ceilings, Trim and Closets

Wall and Ceiling Materials Drywall

Stairs and Railings

Standard

Interior Doors

Hollow Core

Windows

Window Glazing Double pane

Interior Window Frame Vinyl

Window Styles Double hung

Mechanical Ventilation

Bath Fan Ducting Ducted to exterior

Kitchen Fan Ducting Ducted to exterior

Kitchen

Sinks and Faucets

Tested

(K-1) Repair:

The loose faucet for the kitchen sink should be secured to prevent leaks.

(K-2) Repair:

Stored items in the kitchen sink cabinet limited our observations.

Cabinets and Countertops

Countertop Material Granite

Cabinet Material Wood

Ventilation Method

Fan ducted to exterior

Appliances

Refrigerator Operating

Dishwasher Operated

Dishwasher Air Gap Just a high loop

Range/ Oven /Cook-tops Gas

Disposer None noted

General Kitchen Condition

Standard

Powder Bathroom

Sinks and Cabinets

Tested

Toilet

Tested

Bathtub / Shower

None noted

Bathroom Ventilation

Type Bath fan

General Bath Condition

Standard

(PB-1) Note:

During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

Family Bathroom

Sinks and Cabinets

Tested

Toilet

Tested

General Bath Condition

Standard

(FB-1) Note:

During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

Master Bathroom

Sinks and Cabinets

Tested

Wall/Ceilings/Floors

Wall Material Drywall, Functional

Ceiling Material Drywall, Functional

Floor Material Hardwood, Sheet goods, Area rug, Functional

Bathroom Plumbing Fixtures

Condition Functional

Toilet

Condition Functional

Bathroom Ventilation

Type Bath fan, Operable window

General Bath Condition

Standard

(MB-1) Note:

During inspection today I operated all plumbing fixtures in bathrooms. I ran a moisture meter around toilets and tile shower enclosures to check for concealed leaks. I also sounded for loose finishes in shower and tub enclosures. I felt for loose waste pipe below sinks and where accessible and checked for leaks below sinks. I do not test bathtub overflow drains during inspection as this risks damaging finishes around the tub. I did not see any signs of previous leaks relating to the overflow during inspection today. I recommend monitoring tubs while filling and avoid pushing water into the bathtub overflow. Even well-installed overflow drains can leak as the gaskets that seal the overflow will dry out over time and may no longer provide a watertight seal. Monitor plumbing after moving into a new home as testing during inspection presents less stress on plumbing than daily use. Any defects uncovered during inspection are listed in this report.

Guest Bathroom

Sinks and Cabinets

Tested

Toilet

Tested

General Bath Condition

Standard

Receipt -- Residential Inspection

Report #: 190216A
Inspection Date: 2019-02-15

Property Inspected For 
Juan Morales
2036 Pinnickinnick Street Piscataway, NJ 08854

Inspection with digital report $375.00
Radon Tesing $165.00

$540.00

PAID


Optimal Home Inspections
C/O Marshal
429 Fairmount Ave #210
Jersey City, NJ 07306
732-325-8642